TAMIU Campus Plan Master Plan Update, May 2023

125 Campus Master Plan Update 125 C/ APPENDIX S R Q U T RLC FPA PLANT STC CNS KLM WHT LBV KCB P J N L F D C B A G H K O M I 6" SAN 8" SAN 8" SAN 8" SAN 12" SAN 12" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 12" SAN 12" SAN 12" SAN 12" SAN Seal and Signature : Issues/Revisions : No. Drawing Title: Date Certification Statement : This document and the information herein is the property of Martinez Moore Engineers, LLC. No part hereof shall be copied, duplicated, distributed, disclosed or used to any extent whatsoever except as expressly authorized by Martinez Moore Engineers, LLC. Any person, firm, or corporation receiving this document, however obtained, shall by virtue hereof, be deemed to have agreed to the forgoing restrictions and that this document will be held in trust and confidence subject only to the private use expressly authorized by Martinez Moore Engineers, LLC. Copyright (c) 2016 by Martinez Moore Engineers, LLC. Project Number : Approved By : Drawn By : Checked By : Filename : TO THE BEST OF THE ENGINEER'S KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES. SITE EXHIBIT Description Project Status Keyplan : Consultants / Discipline : Client : Project : APR DRW CHK Project Number MARTINEZ MOORE ENGINEERS, LLC 401 SOUTH 1ST STREET, SUITE 600 AUSTIN, TX 78704 PHONE: 512-330-1278 X:\Y03\2021\21008-00 TAMIU Master Plan\2-Design\04-Exhibits\2023-04-06-SITE EXHIBIT\Y03-21008-00-TAMIU MASTER PLAN SITE EXHIBIT.dwg pm NEAR-TERM PLAN MID-TERM PLAN LONG-TERM PLAN LEGEND: UTILITIES IN THE CLOUDED AREA ARE PROPOSED TO BE REMOVED PROPOSED SANITARY LINE - PHASE 1 DEMO 12" SAN PROPOSED 12" SAN (PHASE -3 PLAN) EXISITNG SEWER LIFT STATION EXISITNG SEWER LIFT STATION SEWER FORCE MAIN SEWER FORCE MAIN DEMO 8" SAN (PHASE -1 PLAN) PROPOSED 8" SAN (PHASE -1 PLAN) PROPOSED 8" SAN (PHASE-2 PLAN) SEWER FORCE MAIN SEWER FORCE MAIN PROPOSED 8" SAN (EXTENSION FROM PHASE-2 PLAN) (PHASE -3 PLAN) PROPOSED 8" SAN (PHASE-2 PLAN) ABANDON 12" SAN IN PLACE (PHASE-1 PLAN) PROPOSED 12" SAN (PHASE-1 PLAN) NEAR-TERM PLAN MID-TERM PLAN LONG-TERM PLAN LEGEND: UTILITIES IN THE CLOUDED AREA ARE PROPOSED TO BE REMOVED PROPOSED SANITARY LINE - PHASE 1 PROPOSED SANITARY LINE - PHASE 2 PROPOSED SANITARY LINE - PHASE 3 TAMIU MASTER PLAN SITE SANITARY EXHIBIT TBPE Firm Registration No. F-16839 March, 2023

RkJQdWJsaXNoZXIy Mzk1Mzc4