TAMIU Campus Plan Master Plan Update, May 2023

129 Campus Master Plan Update 129 C/ APPENDIX S R Q U T RLC FPA PLANT STC CNS KLM WHT LBV KCB P J N L F D C B A G H K O M I 6'X4' BOX CULVERT EX. 24" RCP EX. 36" RCP EX. 8" PVC EX. 15" RCP EX. 42" RCP EX. 42" RCP EX. 18" RCP EX. 18" RCP EX. 30" RCP EX. 30" RCP EX. 12" STM PIPE EX. 24" RCP EX. 12" PVC EX. 18" RCP EX. 12" PVC EX. 18" RCP EX. 12" PVC EX. 48" RCP EX. 24" RCP EX. 24" RCP EX. 36" RCP EX. 24" RCP EX. 24" RCP EX. 30" RCP EX. 24" RCP EX. 12" STM PIPE EX. 8" STM PIPE EX. 12" STM PIPE EX. 18" STM PIPE EX. 8" STM PIPE EX. 18" RCP EX. 12" PVC EX. 18" RCP EX. 8" VERTICAL PIPE EX. 12" RCP EX. 12" RCP EX. 18" RCP EX. 4" HDPE (TYP) EX. 4" HDPE (TYP) EX. 18" HDPE EX. 24" RCP EX. 24" RCP EX. 36" RCP EX.24" RCP EX. 4" HDPE (TYP) EX. 2 X 36" STM CULVERTS EX. 24" STM CULVERT EX. 2 X 36" STM CULVERTS EX. 24" STM CULVERT EX. 24" STM CULVERT EX. 36" STM CULVERT EX. 18" STM PIPES Seal and Signature : Issues/Revisions : No. Drawing Title: Date Certification Statement : This document and the information herein is the property of Martinez Moore Engineers, LLC. No part hereof shall be copied, duplicated, distributed, disclosed or used to any extent whatsoever except as expressly authorized by Martinez Moore Engineers, LLC. Any person, firm, or corporation receiving this document, however obtained, shall by virtue hereof, be deemed to have agreed to the forgoing restrictions and that this document will be held in trust and confidence subject only to the private use expressly authorized by Martinez Moore Engineers, LLC. Copyright (c) 2016 by Martinez Moore Engineers, LLC. Project Number : Approved By : Drawn By : Checked By : Filename : TO THE BEST OF THE ENGINEER'S KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES. SITE EXHIBIT Description Project Status Keyplan : Consultants / Discipline : Client : Project : APR DRW CHK Project Number MARTINEZ MOORE ENGINEERS, LLC 401 SOUTH 1ST STREET, SUITE 600 AUSTIN, TX 78704 PHONE: 512-330-1278 X:\Y03\2021\21008-00 TAMIU Master Plan\2-Design\04-Exhibits\2023-04-06-SITE EXHIBIT\Y03-21008-00-TAMIU MASTER PLAN SITE EXHIBIT.dwg pm STORM PIPES IN THIS AREA NEEDS TO BE REMOVED AND RELOCATED (PHASE-1 PLAN) STORM PIPES AND INLETS IN THIS AREA NEEDS TO BE REMOVED AND RELOCATED (PHASE-1 PLAN) INLETS IN THIS AREA NEEDS TO BE REMOVED AND RELOCATED STORM PIPES AND INLETS IN THIS AREA NEEDS TO BE REMOVED AND RELOCATED STORM PIPES AND INLETS IN THIS AREA NEEDS TO BE REMOVED AND RELOCATED STORM PIPES AND INLETS IN THIS AREA NEEDS TO BE REMOVED AND RELOCATED NEAR-TERM PLAN MID-TERM PLAN LONG-TERM PLAN LEGEND: UTILITIES IN THE CLOUDED AREA ARE PROPOSED TO BE REMOVED AND RELOCATED TAMIU MASTER PLAN SITE STORMWATER EXHIBIT TBPE Firm Registration No. F-16839 March, 2023

RkJQdWJsaXNoZXIy Mzk1Mzc4